Service
Reliability

The best products are not enough
if they are not delivered on time

For our clients, receiving their orders on time means they can plan their production cycles accurately and have their products on the market as scheduled. Minelli understands that producing top class wood products is not enough if we do not respect our client’s deadlines and deliver each order as scheduled. Thanks to our consolidated process, our company’s structure and our tailor made logistic solutions, we can guarantee incomparable service reliability.

Production plan

Each order is programmed down to the last detail in our production software. Every step is carefully planned so that the full cycle is completed on time before the scheduled delivery. In case of unforeseen circumstances that may affect delivery time, an automatic notification is instantly sent to production manager. This ensures that the necessary measures can be taken to guarantee punctual production and completion of order on time.

Back-up production lines

Five manufacturing plants located at different sites give Minelli access to dozens of production lines. This grants Minelli the necessary flexibility in the event of unpredicted failures at the primary manufacturing facility. We understand that it is important always having a backup production line in order to guarantee the on time delivery of each order.

Private stocking

When required, Minelli is able to provide customizable private stocking solutions in order to guarantee JIT delivery. With over 350,000 square feet, Minelli can manufacture products in advance and store them in secure and safe warehouses. Thanks to these Private Stocking solutions, the client can order his components from stock with virtually instantaneous delivery.

Production plan

Each order is programmed down to the last detail in our production software. Every step is carefully planned so that the full cycle is completed on time before the scheduled delivery. In case of unforeseen circumstances that may affect delivery time, an automatic notification is instantly sent to production manager. This ensures that the necessary measures can be taken to guarantee punctual production and completion of order on time.

Back-up production lines

Five manufacturing plants located at different sites give Minelli access to dozens of production lines. This grants Minelli the necessary flexibility in the event of unpredicted failures at the primary manufacturing facility. We understand that it is important always having a backup production line in order to guarantee the on time delivery of each order.

Private stocking

When required, Minelli is able to provide customizable private stocking solutions in order to guarantee JIT delivery. With over 350,000 square feet, Minelli can manufacture products in advance and store them in secure and safe warehouses. Thanks to these Private Stocking solutions, the client can order his components from stock with virtually instantaneous delivery.

case study

Trans-Atlantic Customer Demands JIT Inventory, Requires Innovative Approaches
Problem
  • US Customer Moved to a 30 Day Order-To-Delivery Policy Using Ocean Delivery
  • Existing Procedures Set Up To Meet Original 75 Day Policy
  • Raw material Preparation (15 Days)
  • Production (30 Days)
  • Ocean Transport (30 Days)
Solution

Minelli studied the complete process from raw material ordering to production and delivery to identify crucial steps which can be optimized

Implementation

Minelli totally revamped the processes to meet new requirements 60 day supply of dried wood were guaranteed at all times

Result

Lead times cut by over 50% with no loss of orders shipped
Customer rewarded Minelli with 100% increase in business

wood private stocking
Problem
  • US Customer Moved to a 30 Day Order-To-Delivery Policy Using Ocean Delivery
  • Existing Procedures Set Up To Meet Original 75 Day Policy
  • Raw material Preparation (15 Days)
  • Production (30 Days)
  • Ocean Transport (30 Days)
Solution

Minelli studied the complete process from raw material ordering to production and delivery to identify crucial steps which can be optimized

Implementation

Minelli totally revamped the processes to meet new requirements 60 day supply of dried wood were guaranteed at all times

Result

Lead times cut by over 50% with no loss of orders shipped
Customer rewarded Minelli with 100% increase in business